Dam Engineering ......... |
|
With a long-standing
involvement in the supply of
water, FARAZAB has designed
and supervised the
construction of several
dams. FARAZAB dam
department, traditionally
active in dam engineering,
has been responsible for the
design and construction
supervision of more than one
hundred dams. FARAZAB has
designed several different
earth fill dams with clay
cores, that also serve river
regulation and irrigation
purposes.
Earth fill dams.
Geological and seismological
studies.
Geotechnics
and foundation
treatment.
Soil conservation &
watershed management.
|
|
.........
Projects List .........
|
|
|
|
|
|
|
|
.............................. ..............................
Danaloo Reservoir
Dam:
Client: west_
azarbijan regional
water company
Location: NW of
iran.7 km from maku
in west_ azarbijan
province
Scope: regulate and
storage catchments
area flow to
transfer to sari_ su
river in cultivation
seasons in order to
develop and improve
shahid ghanbari
farmlands.
Catchments
area:114km2
river annual
intake:1.94nMCM
Dam type: earth fill
with impervious clay
core
height from
bedrock:23m
crest length:370m
reservoir
volume:2.065
MCM
spillway: Ogee
earthworks
volume:380,000 m3
diversion system:
bottom outlet (steel
pipe)
intake system:
intake tower
foundation water
tightness system:
grouting curtain
cost of
constriction: USD
1.2 millions
|
|
.............................. ..............................
Filekhase Reservoir
Dam:
Location: Nw of
Iran, 75 km NW of
zanjan city in
zanjan province
Scope: regulating
and storing of
catchments are flow
in order to develop
and improve
fleches farmlands.
catchments
area:104.85 km2
river annual intake:
4.3 MCM
dam type: earth fill
with impervious clay
core
height from
bedrock:19m
crest lenght:745m
reservoir
volume:2.24 MCM
spillway: Ogee
Earthworks
Volume:450,000 m3
Diversion system:
bottom outlet (stell
pipe)
intake system :
intake tower
foundation water
tightness system:
upstream blanket
cost of
construction: USD
3,400,000
|
|
.............................. ..............................
Shahid
Ghanbari Reservoir
Dam and
irrigation/Drainage
Network:

Client:
west_azarbijan
regional water
company
Location: NW if
iran,9km NW of Maku
in west_azarbijan
province
Scope: regulate and
store 28.8 MCM
annual flow of Sari_
Su river to optimize
irrigation potential
as well as
development and
improvement of
irrigation/drainage
system in 5,000 ha
in shahid ghanbari
plain farmlands.
in this project
Sari_ Su river flow
is diverted by a
levee and
transferred to the
ghanbari reservoir
dam through a 4 km
length canal. the
dam has been planned
and constructed to
regulate all the
river discharged and
enhance the
irrigation potential
to regulate all the
river discharged and
enhance the
irrigation potential
in the plain. 29 MCM
water potential
created by these
establishments will
be come together
with approximately
12.3 MCM annual
volume of present
springs in the
plain.
these amounts of
water will be used
to develop 1750 ha
and improve 3250 ha
of the downstream
farmlands.
area: 2,471 km2
river annual intake:
48.8 MCM
dam type: earth fill
with impervious clay
core
height from
bedrock:23.5m
crest lenght:594m
reservoir
volume:26.5 MCM
spillway: Ogee
spillway crest
lenght:8.0m
earthworks
volume:770,000 m3
diversion system:
bottom outlet (steel
pipe)
intake system:
intake tower
foundation water
lightness system:
mainly by grouting
curtain(8,000 m
drilling length)
inspection and
grouting gallery
with total length of
365m
cost of
construction: USD 10
millions
|
|
.............................. ..............................
water supply of
Golfaraj, Gordian,
Yekanat and
Harzandat Plains :
client: East_
azarbijan and
ardabil regional
water authority
Location: NW of
iran,10 km from
jolfa in east_
azarbijan province
Scope: water supply
and irrigation of
Golfaraj, Gordian,
Harzandat and yekant
plains (25,000 ha)
via establ ishment
of pumping systems
to take the water
from aras river,
transfer and store
it in four separate
reservoir dams along
with developing
relevant irrigation
and drainage network
in the plains.
The dams and related
reservoirs have been
considered to
regulate the pumped
volume to reduce the
required maximum
capacity of pumping
and transferring
system and
consequently project
costs.
Project components:
pumping stations,
transferring system,
golfaraj dam,
gordian dam,
harzandat dam,
yekanat dam,
irrigation and
drainage network
|
|
.............................. ..............................
Likvan Reservoir Dam:
client:
Ardabil water
affairs
administration
Location: NW of
iran,25 km from
kosar in ardabil
province
Scope: irrigate 410
ha of farmlands of
likvan and
firoozabad villages.
|
|
.............................. ..............................
Water supply of
jaeer and noruzabad
plains( norouzabad
reservoir dam):
Client: East_
Azarbijan and
ardabil regional
water authority
Location: NW of
iran,30 km from
mianeh in east_a
zarbijan province
Scope: take and
transfer of ghezel_
ozan river discharge
to store in
norouzabad
reservoir
dam in order to
develop downstream
farmlands in jeer
plain (13,110 ha)
Project components:
intake and pumping
system, transmission
pipeline, norouzabad
reservoir dam,
irrigation and
drainage network
dam type: earth fill
with
impervious clay core
height from river
bed: 39.3m
reservoir
volume:53MCM
spillway type: Ogee
spillway crest
length: 6m
diversion system:
bottom outlet (steel
pipe)
intake system:
intake tower
foundation water
tightness system:
plastic concrete
cut_ off wall
cost of
construction: USD
14.5 millions.
|
|
.............................. ..............................
Sorkhab reservoir
dam project :
client: ardabil
water affairs
administration
(under construction)
Location: NW of
iran,55 km from
ardabil in ardabil
province
Scope: string 1.2
MCM of floods ans
run_ offs of
aghlaghan river(
with a diversion
levee and canal) to
irrigate 190 ha of
lowlands.
Catchments sera:
62.5 km2
river annual
intake:11.0 MCM
dam type: earth fill
with impervious clay
core
height from river
base:14 m
reservoir volume: 1.5 MCM
crest length: 220m
gross earth works
volume:70,000 m3
spillway type: Ogee
spillway crest
length: 3.0m
diversion system:
bottom outlet (steel
pipe)
intake system:
intake tower
foundation water
lightness system :
upstream impervious
blanket
cost of
construction: USD
1,364,000
|
|
.............................. ..............................
Yalghouzaghj
Reservoir Dam
Project:
Client: east
azarbijan water
affairs
administraation(
under construction)
Location: NW of
iran,20 km from gharechaman in east
azarbaijan province
Scope: to gather 1.6
MCM of floods and
run_ offs of tribal
river in
yalghouzaghaj
reservoir dam to
irrigate 170 ha of
lowlands.
catchments area:
30.6 km2
river annual
discharge:3.4 MCM
dam type: earth with
impervious clay core
height from river
base:21m
reservoir
volume:300,000 m3
spillway type: ogee
spillway crest
length:4m
diversion system:
bottom outlet (steel
pipe)
intake system:
intake tower
cost of
construction: USD
1,250,000
|
|
|